Business Background

The client is a Xuzhou-based crane manufacturer with products exported worldwide. This shipment involves exporting a batch of machinery equipment to Port Klang, Malaysia, for local engineering projects.

The client contacted our company online. After consultation with our advisor, the requirements were clarified: brand-new cranes with complete documentation, requiring formal customs declaration and export tax rebate processing. The export port selected was Shanghai (suitable for oversized cargo), with Port Klang as the destination port. Our company was responsible for the full logistics chain from the Xuzhou factory to Port Klang, ensuring safe and compliant delivery of the goods.

Business Process

The machinery weighed approximately 32 tons with a volume of 14 cubic meters. Based on the cargo specifications, our company arranged international break-bulk sea freight services. We provided comprehensive logistics support including loading/unloading, crane operations, vessel chartering and booking, customs declaration and inspection, insurance, inland trucking, and door-to-door delivery to ensure safe arrival at the destination.

Equipment Export Procedure Flow

1. Research import customs policy requirements of the destination country

2. Sign agency agreement

3. Book vessel and cargo space, prepare relevant export documentation

4. On-site packing and pickup

5. Transport to port of departure, schedule container stuffing

6. Complete export customs clearance and arrange ocean freight to destination country

7. Provide corresponding import documentation and nameplate information to pre-apply for required import permits

8. Upon arrival at destination port, arrange import customs clearance and tax payment

9. Complete destination country customs clearance and release (inspection)

10. Collect goods and transport to destination factory

Required Documentation Checklist

1. Certificate of Origin

2. Import/Export License

3. Declaration Elements

4. Product Manual

5. Destination Country Import Permit

6. Photos of Appearance and Nameplate

7. Packing List, Commercial Invoice, Contract, Bill of Lading

Important Notes

1. Equipment Inspection and Preparation

Ensure comprehensive pre-shipment inspection to verify full functionality. Secure all components to prevent loosening or damage during transit.

2. Container Loading Arrangements

During loading, pay attention to the weight distribution of the equipment to ensure even placement and avoid uneven stress on the container. Use specialized handling equipment such as cranes to minimize the risk of equipment damage.

3. Customs Clearance and Documentation

Prepare all necessary export documents, including commercial invoices, packing lists, and export licenses. Ensure compliance with the import requirements of the destination country to avoid customs clearance delays.